Supplier assessment
Supplier assessment, also known as supplier evaluation, is the process of assessing potential and existing suppliers. In the construction industry, ‘supplier’ is a very general term which refers to organisations contracted as part of the delivery of a built asset.
The aim of supplier assessment is to ensure that the needs of the client organisation are met and, in the case of current suppliers, to examine and measure performance in terms of whether improvements or efficiencies can be made. It forms an essential part of strategic sourcing of suppliers and supplier management, as well as helping to maintain competitiveness.
A model known as the ‘Carter 10Cs model’ is a widely-recognised method of assessing suppliers. The ‘Cs’, which are examined in terms of whether the supplier is sufficiently able to provide them, are as follows:
- Capacity.
- Competency.
- Consistency.
- Control of process.
- Commitment to quality.
- Cash.
- Competitive cost.
- Culture.
- Clean/ethical.
- Communication efficiency.
Supplier assessment may be carried out using a supplier assessment form which is a questionnaire filled in by suppliers.
The typical categories that may appear on a supplier assessment form include:
- Supplier information: Names, addresses, etc.
- Contracts management system: Projected turnover, issued share capital, combined value of orders, etc.
- Quality management system: Training programmes, inspections process, product handling, etc.
- Standards/certifications: Current approvals and so on.
- Health and safety: Accredited programmes, policies and procedures, etc.
- Security: Procedures and processes, etc.
The advantages of using a supplier assessment process are that it can help mitigate against poor performance or failures on the part of suppliers; ensure high standards of product and service; and can serve as a form of motivation for suppliers to improve.
Some of the challenges for the client include allocating adequate time and other resources to effectively establish and maintain an assessment system. In addition, there is the challenge of providing suppliers with performance feedback so that continuous improvement can be achieved.
Other forms of supplier assessment include:
- Selection criteria, against which prospective suppliers can be assessed.
- Pre-qualification questionnaires - used during procurement processes to enable the client to produce a short list of suppliers that are likely to be most appropriate for their particular project.
- Tender evaluations - a process of assessment undertaken during procurement processes to identify a preferred tenderer.
- Due diligence - assessment of the capability and financial status of a prospective supplier before appointing them.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February